- 6/1/18 Friday – The front parking lot is expected to be getting torn up on Friday, June 1. The back parking lot will be open for use.
- 6/2/18 Saturday – The back parking lot will be closed on Saturday June 2 so that the second layer of asphalt can be laid. So that leaves no on-site parking. the front lot is torn up and the back lot is getting the second layer of asphalt.
- 6/4/18 Monday … On Monday, June 4, the back parking lot will be open for your use, and the front parking lot will be closed for a few weeks.